Customization: | Available |
---|---|
After-sales Service: | 24 Hours Online Service |
Warranty: | 16 Month After Bl Date |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Fin-bar straightening & calibration production line consists of fin-steel calibration machine (including the horizontal correcting, bending straightening and fixed-length devices) cutting machine and force-feeding conveyors. This production line is one of the key equipment to ensure the welding quality of the membrane wall, mainly used in fin-steel's pre-heater before welding membrane wall tube panel, to ensure the welding quality. Tempered discal-shaped fin-bar processed through this production line, according to the size of the tube to calibration the fin-steel, then horizontal correcting and bending straightening to meet the requirement of the front welding, and last according to the length of pipe to cut off.
In order to make the tempered fin-steel to calibration smoothly, pre-horizontal correcting device is equipped in the calibration wheel.
- Adopting secondary calibration.
- Using five roller leveling method, in which two rolls take the initiative to roll.
- Using five roller straightening ways, in which two rolls take the initiative to roll.
- The fixed-length fin-steel device equipped with pulse encoder, to scale the length of the fin-steel.
- Force-feeding conveyors of fin-steel.
- Fixed-length fin-steel cutting off production line using imported PLC as a control unit, with strong anti-interference and stable performance.
Item | Specification |
Fin-bar width | 12-120mm |
Fin-bar thickness | 3-12mm |
Maximum calibration value | 2.0mm |
Calibration precision | ±0.1mm |
Calibration speed | 0.5-12m/min |
Main motor | 7.5KW |
Machine size | 4200*1100*1500mm |
Machine weight | 4200kgs |
1. Where is your factory located ?
Friendship Machinery CO., LTD (FSM) is located in Wuxi, Jiangsu, and about 40mins from Shanghai if take railway.
2. How can you guarantee your product quality?
From raw material purchase to production, FSM has strict restriction. And we will provide 1 year warranty time for all the products. ISO 9001 and CE certification can be provided.
3. How long is one order production time?
After you place a order, the production handling time is about 25-30 days. It will subject to our factory production schedule.
4. Can you accept special order?
Yes, we have our own R&D center , and our engineer can provide machine drawing according to your requirement.
5. Are your engineers available for oversea project ?
Yes, our engineers can be delegated aboard for machine installation and debugging.
6. How can you make sure the deal safe?
You can pay by TT/ LC. Making the world a better place is our company's beautiful vision, we will be your trusted partner.